Roads24FJ0011

OO1: NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS, BUENAVISTA- KAWAYAN RD- K0055+800- K0056+090

OO1: NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS, BUENAVISTA- KAWAYAN RD- K0055+800- K0056+090 is a DPWH-tracked public work in Masbate 3rd DEO, Region V. Reported contract value: ₱14,013,432.80. Status: Reported complete (DPWH). Contractor on record: LEGACY BSCA CONST AND SUPPLY CORP 51044. Figures trace to dpwh.

Masbate 3rd DEO, Region V
Region: Region V

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Canomay Flood Control, Barangay Canomay, Dimasalang, Masbate
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Masbate 3rd DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 51044

23 projects · ₱327.1M total · 0 flags

Other projects by this contractor

No sat.

CSSP- BIP- ACCESS ROADS AND / OR BRIDGES FROM THE NATIONAL ROADS/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDING/ FACILITIES- CONSTRUCTION OF ROAD BARANGAY TANQUE- BARANGAY TUBIGAN ROAD, PIO V. CORPUZ, MASBATE

Masbate 3rd DEO, Region V

2022₱29.7M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION/ IMPROVEMENT OF GUINOBATAN RIVER CONTROL, STA.3+801.50 - STA.3+810.00 (DOWNSTREAM), STA.3+834.70 - STA.3+934.20 (UPSTREAM, LEFT SIDE)

Masbate 2nd DEO, Region V

2022₱29.5M
Reported complete (DPWH)
No sat.

OO1: NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS, BUENAVISTA- KAWAYAN RD- K0060+539- K0061+300

Masbate 3rd DEO, Region V

2024₱25.9M
Reported complete (100% progress, DPWH status On-Going)
No sat.

LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-BUILDING AND OTHER STRUCTURES-CONSTRUCTION OF COAST GUARD REGIONAL TRAINING CENTER, BRGY. MATAYUM, CATAINGAN, MASBATE

Masbate 3rd DEO, Region V

2021₱24.7M
Reported complete (100% progress, DPWH status On-Going)
No sat.

BIP- ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES- CONSTRUCTION OF CONCRETE ROAD, BRGY. CALAPAYAN TO LIBERTAD, CAWAYAN, MASBATE

Masbate 3rd DEO, Region V

2023₱19.8M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY MAOLINGON, MANDAON,

Masbate 2nd DEO, Region V

2024₱19.6M
Past target date (DPWH On-Going)
View all 23 projects →

4. Implementation

Contract Amount

₱14,013,432.80

Progress

Reported complete (DPWH)

Start Date

June 28, 2024

Target End

September 28, 2024

5. Audit