Roads22FJ0017

CSSP- BIP- ACCESS ROADS AND / OR BRIDGES FROM THE NATIONAL ROADS/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDING/ FACILITIES- CONSTRUCTION OF ROAD BARANGAY TANQUE- BARANGAY TUBIGAN ROAD, PIO V. CORPUZ, MASBATE

CSSP- BIP- ACCESS ROADS AND / OR BRIDGES FROM THE NATIONAL ROADS/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDING/ FACILITIES- CONSTRUCTION OF ROAD BARANGAY TANQUE- BARANGAY TUBIGAN ROAD, PIO V. CORPUZ, MASBATE is a DPWH-tracked public work in Masbate 3rd DEO, Region V. Reported contract value: ₱29,699,615.98. Status: Reported complete (DPWH). Contractor on record: LEGACY BSCA CONST AND SUPPLY CORP. Figures trace to dpwh.

Masbate 3rd DEO, Region V
Region: Region V

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱36,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Concrete Revetment at Buenavista River, Brgy. Magsaysay Uson, Masbate
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Masbate 3rd DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

24 projects · ₱351.6M total · 0 flags

Other projects by this contractor

No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION/ IMPROVEMENT OF GUINOBATAN RIVER CONTROL, STA.3+801.50 - STA.3+810.00 (DOWNSTREAM), STA.3+834.70 - STA.3+934.20 (UPSTREAM, LEFT SIDE)

Masbate 2nd DEO, Region V

2022₱29.5M
Reported complete (DPWH)
No sat.

OO1: NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS, BUENAVISTA- KAWAYAN RD- K0060+539- K0061+300

Masbate 3rd DEO, Region V

2024₱25.9M
Reported complete (100% progress, DPWH status On-Going)
No sat.

LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-BUILDING AND OTHER STRUCTURES-CONSTRUCTION OF COAST GUARD REGIONAL TRAINING CENTER, BRGY. MATAYUM, CATAINGAN, MASBATE

Masbate 3rd DEO, Region V

2021₱24.7M
Reported complete (100% progress, DPWH status On-Going)
No sat.

Construction of Poblacion Balud Seawall, Balud, Masbate

BALUD (MASBATE), MASBATE, Region V

2022₱24.5M
Reported complete (DPWH)
No sat.

BIP- ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES- CONSTRUCTION OF CONCRETE ROAD, BRGY. CALAPAYAN TO LIBERTAD, CAWAYAN, MASBATE

Masbate 3rd DEO, Region V

2023₱19.8M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY MAOLINGON, MANDAON,

Masbate 2nd DEO, Region V

2024₱19.6M
Past target date (DPWH On-Going)
View all 24 projects →

4. Implementation

Contract Amount

₱29,699,615.98

Progress

Reported complete (DPWH)

Start Date

February 14, 2022

Target End

July 9, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.