GAA 2025 OO-225KL0009

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ALUBIJID RIVER, BARANGAY BENIGWAYAN SECTION (PACKAGE 1), ALUBIJID, MISAMIS ORIENTAL

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ALUBIJID RIVER, BARANGAY BENIGWAYAN SECTION (PACKAGE 1), ALUBIJID, MISAMIS ORIENTAL is a DPWH-tracked public work in Misamis Oriental 2nd DEO, Region X. Reported contract value: ₱48,481,812.90. Status: Past target date (DPWH On-Going). Contractor on record: ROAD EDGE TRADING & DEVELOPMENT SERVICES 33140. Figures trace to dpwh.

Misamis Oriental 2nd DEO, Region X
Region: Region X

Money Trail

1. Appropriation

Probable match · score 98%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Alubijid River, Barangay Benigwayan Section (Package 1), Alubijid, Misamis Oriental
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Misamis Oriental 2nd DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 33140

33 projects · ₱2.0B total · 0 flags

Other projects by this contractor

OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, BUENAVISTA

Isabela 3rd DEO, Region II

2024₱144.7M
Reported complete (DPWH)
No sat.

OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, DAMMAO SEC

Isabela 3rd DEO, Region II

2024₱144.7M
Past target date (DPWH On-Going)
No sat.

REHAB./RECONST. OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG PORT BARTON TO BRGY. KEMDENG ROAD, STA. 014+050.00-STA. 014+360.00, SAN VICENTE, PALAWAN

Region IV-B, Region IV-B

2022₱122.9M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM - FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. ROXAS (STA. 0+000 - STA. 0+510) NAGUILIAN, ISABELA

Isabela 3rd DEO, Region II

2023₱99.0M
Past target date (DPWH On-Going)
No sat.

OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL, BARANGAY DICABISAGAN WEST (AGUINALDO SHRINE)

Isabela 3rd DEO, Region II

2024₱96.5M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF RIVER / FLOOD CONTROL PROJECT ALONG BALATUKAN RIVER, BRGY. NAPALIRAN, BALINGASAG, MISAMIS ORIENTAL

Misamis Oriental 1st DEO, Region X

2025₱94.6M
Past target date (DPWH On-Going)
View all 33 projects →

4. Implementation

Contract Amount

₱48,481,812.90

Progress

Past target date (DPWH On-Going)

Start Date

February 3, 2025

Target End

November 9, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.