CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PACUGAO RIVER, BALER, AURORA
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PACUGAO RIVER, BALER, AURORA is a DPWH-tracked public work in Aurora DEO, Region III. Reported contract value: ₱95,531,215.95. Status: Past target date (DPWH On-Going). Contractor on record: DALCON CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
