GAA 2025 DEPED BEFF25BD0113

CONSTRUCTION OF SCHOOL BUILDING (PHASE 2), BACCUIT ELEMENTARY SCHOOL, BARANGAY BACCUIT, AMULUNG, CAGAYAN

CONSTRUCTION OF SCHOOL BUILDING (PHASE 2), BACCUIT ELEMENTARY SCHOOL, BARANGAY BACCUIT, AMULUNG, CAGAYAN is a DPWH-tracked public work in Cagayan 3rd DEO, Region II. Reported contract value: ₱9,592,052.36. Status: Past target date (DPWH On-Going). Contractor on record: VHT CAGAYAN BUILDERS CORP. Figures trace to dpwh.

Cagayan 3rd DEO, Region II
Region: Region II

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Malinta Flood Control Structure along Zinundungan River, Barangay Malinta, Lasam, Cagayan
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Cagayan 3rd DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

14 projects · ₱129.0M total · 0 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF DRAINAGE SYSTEM ALONG TUGUEGARAO DIVERSION ROAD 2, TUGUEGARAO CITY, CAGAYAN, PHASE III

Cagayan 3rd DEO, Region II

2024₱29.3M
Past target date (DPWH On-Going)
No sat.

Construction of Cagayan River Flood Management Projects, Centro, Amulung, Cagayan

AMULUNG (CAGAYAN), CAGAYAN, Region II

2024₱19.6M
Reported complete (DPWH)
No sat.

SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DRAINAGE SYSTEM ALONG TUGUEGARAO DIVERSION ROAD 2, TUGUEGARAO CITY, CAGAYAN, PHASE IV

Cagayan 3rd DEO, Region II

2025₱11.5M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF 2-STOREY 6-CLASSROOM SCHOOL BUILDING (PHASE I) IN BACCUIT ELEMENTARY SCHOOL, BARANGAY BACCUIT, AMULUNG, CAGAYAN

Cagayan 3rd DEO, Region II

2024₱9.9M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) -ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF LOCAL ROAD, BARANGAY PADUL, SOLANA, CAGAYAN

Cagayan 3rd DEO, Region II

2025₱6.7M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD, BARANGAY NABBOTUAN, SOLANA, CAGAYAN

Cagayan 3rd DEO, Region II

2025₱6.7M
Past target date (DPWH On-Going)
View all 14 projects →

4. Implementation

Contract Amount

₱9,592,052.36

Progress

Past target date (DPWH On-Going)

Start Date

May 27, 2025

Target End

November 17, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.