GAA 2025 SSP25BD0152

SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DRAINAGE SYSTEM ALONG TUGUEGARAO DIVERSION ROAD 2, TUGUEGARAO CITY, CAGAYAN, PHASE IV

SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF DRAINAGE SYSTEM ALONG TUGUEGARAO DIVERSION ROAD 2, TUGUEGARAO CITY, CAGAYAN, PHASE IV is a DPWH-tracked public work in Cagayan 3rd DEO, Region II. Reported contract value: ₱11,509,174.41. Status: Past target date (DPWH On-Going). Contractor on record: VHT CAGAYAN BUILDERS CORP 49270. Figures trace to dpwh.

Cagayan 3rd DEO, Region II
Region: Region II

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures Along Paranan River, Baggao, Cagayan
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Cagayan 3rd DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 49270

13 projects · ₱109.4M total · 0 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF DRAINAGE SYSTEM ALONG TUGUEGARAO DIVERSION ROAD 2, TUGUEGARAO CITY, CAGAYAN, PHASE III

Cagayan 3rd DEO, Region II

2024₱29.3M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF 2-STOREY 6-CLASSROOM SCHOOL BUILDING (PHASE I) IN BACCUIT ELEMENTARY SCHOOL, BARANGAY BACCUIT, AMULUNG, CAGAYAN

Cagayan 3rd DEO, Region II

2024₱9.9M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF SCHOOL BUILDING (PHASE 2), BACCUIT ELEMENTARY SCHOOL, BARANGAY BACCUIT, AMULUNG, CAGAYAN

Cagayan 3rd DEO, Region II

2025₱9.6M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) -ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF LOCAL ROAD, BARANGAY PADUL, SOLANA, CAGAYAN

Cagayan 3rd DEO, Region II

2025₱6.7M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD, BARANGAY NABBOTUAN, SOLANA, CAGAYAN

Cagayan 3rd DEO, Region II

2025₱6.7M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROGRAM ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -CONSTRUCTION OF ROADS AND DRAINAGE AT TUGUEGARAO CITY, CAGAYAN

Cagayan 3rd DEO, Region II

2025₱6.7M
Past target date (DPWH On-Going)
View all 13 projects →

4. Implementation

Contract Amount

₱11,509,174.41

Progress

Past target date (DPWH On-Going)

Start Date

September 1, 2025

Target End

March 19, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.