CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONSTRUCTION OF SLOPE PROTECTION ALONG CAMILING RIVER CONTROL, BILAD SECTION (PHASE 2) , CAMILING, TARLAC 1ST LD
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONSTRUCTION OF SLOPE PROTECTION ALONG CAMILING RIVER CONTROL, BILAD SECTION (PHASE 2) , CAMILING, TARLAC 1ST LD is a DPWH-tracked public work in Tarlac DEO, Region III. Reported contract value: ₱30,999,369.13. Status: Reported complete (DPWH). Contractor on record: ROYAL CROWN MONARCH CONST. Figures trace to dpwh.
Total Contract Cost
