Roads20FE0155

CONCRETING OF BRGY. SAN ISIDRO TO BRGY.ASLONG, LIBMANAN, CAMARINES SUR

CONCRETING OF BRGY. SAN ISIDRO TO BRGY.ASLONG, LIBMANAN, CAMARINES SUR is a DPWH-tracked public work in Camarines Sur 2nd DEO, Region V. Reported contract value: ₱24,551,077.75. Status: Reported complete (DPWH). Contractor on record: JMLD CONST. Figures trace to dpwh.

Camarines Sur 2nd DEO, Region V
Region: Region V

Money Trail

1. Appropriation

Probable match · score 87%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structures/Facilities along Libmanan River at Brgy. Sibujo, Libmanan, Camarines Sur
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Camarines Sur 2nd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

113 projects · ₱1.9B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF FLOOD CONTROL STRUCT. ALONG ANYATAM-MAPANIQUE CREEK, PHASE 5, SAN ILDEFON

Region III, Region III

2024₱133.0M
Ongoing (DPWH-reported)
No sat.

CONVERGENCE & SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJ. ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS./FACILITIES-CONST. OF FLOOD CTRL. STRUCTURE ALONG ANYATAM-MAPANIQUE CREEK,PHASE 8,SAN ILDEFONSO,BUL.

Region III, Region III

2024₱114.1M
Ongoing (DPWH-reported)
No sat.

CONVERGE. AND SPECIAL SUPPORT PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG- FLOOD MITIGATION STRUCTS. PRTOTECTING MAJOR/STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF FLOOD MITIGATION STRUCT. ALONG SAN MIGUEL RIVER, SEGMENT B (SIOJO ST. SEC.)

Bulacan 3rd DEO, Region III

2025₱95.1M
Past target date (DPWH On-Going)
No sat.

CONVERG. AND SPL. SUPPORT PROG.-SUST. INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCT. PROTECTING MAJ./STRAT. PUBLIC BLDGS./FACS.-CONST. OF RIVERBANK PROTECTION STRUCT. ALONG MALANGAAN RIVER(DOWNSTREAM), BRGY. CAMACHILE, DONA REMEDIO

Bulacan 3rd DEO, Region III

2025₱95.1M
Past target date (DPWH On-Going)
No sat.

CONVERG. AND SPL. SUPPORT PROG.-SUST. INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCT. PROTECTING MAJ./STRAT. PUBLIC BLDGS./FACS.-CONST. OF RIVERBANK PROTECTION STRUCT. ALONG MALANGAAN RIVER(UPSTREAM), BRGY. CAMACHILE, DONA REMEDIOS

Bulacan 3rd DEO, Region III

2025₱95.1M
Past target date (DPWH On-Going)
No sat.

CONVERGE. AND SPECIAL SUPPORT PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTS .PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS./ FACILITIES-CONST. OF FLOOD MITIGATION STRUCT. ALONG SAN MIGUEL RIVER, SEG. A (SIOJO ST. SEC.),

Bulacan 3rd DEO, Region III

2025₱95.1M
Past target date (DPWH On-Going)
View all 113 projects →

4. Implementation

Contract Amount

₱24,551,077.75

Progress

Reported complete (DPWH)

Start Date

March 25, 2021

Target End

October 11, 2021

5. Audit