Rehabilitation of Existing Dike along O' Donnell River, Upstream of Palublub Bridge, Right Bank (Package A), Sta. 0+000 to Sta. 0+535.20, Capas, Tarlac
Rehabilitation of Existing Dike along O' Donnell River, Upstream of Palublub Bridge, Right Bank (Package A), Sta. 0+000 to Sta. 0+535.20, Capas, Tarlac is a DPWH-tracked public work in CAPAS (TARLAC), TARLAC, Region III. Reported contract value: ₱86,844,861.33. Status: Reported complete (DPWH). Contractor on record: T2B3 BUILDERS AND SUPPLIES CORP. Figures trace to sumbong.
Total Contract Cost