REHABILITATION/ IMPROVEMENT OF BACOLOD FLOOD CONTROL STRUCTURE (LEFT SIDE FACING DOWNSTREAM OF BACOLOD BRIDGE) IN LIBON, ALBAY
REHABILITATION/IMPROVEMENT OF BACOLOD FLOOD CONTROL STRUCTURE (LEFT SIDE FACING DOWNSTREAM OF BACOLOD BRIDGE) IN LIBON, ALBAY is a DPWH-tracked public work in Albay 3rd DEO, Region V. Reported contract value: ₱9,502,917.83. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: ELKANKONSTRAK DEVELOPMENT CORP. Figures trace to dpwh.
Total Contract Cost

