CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG LABANGAN CHANNEL K007+800 TO K008+302 SAN ISIDRO II, PAOMBONG, BULACAN
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG LABANGAN CHANNEL K007+800 TO K008+302 SAN ISIDRO II, PAOMBONG, BULACAN is a DPWH-tracked public work in Bulacan 1st DEO, Region III. Reported contract value: ₱18,622,384.31. Status: Reported complete (DPWH). Contractor on record: ALPHA. Figures trace to dpwh.
Total Contract Cost


