CONSTRUCTION OF FLOOD CONTROL STRUCTURE, UPSTREAM FROM IGPIT BRIDGE/ BCIR, BOTH SIDES, ALONG BUNGCALALON RIVER, IGPIT, OPOL, MISAMIS ORIENTAL
CONSTRUCTION OF FLOOD CONTROL STRUCTURE, UPSTREAM FROM IGPIT BRIDGE/BCIR, BOTH SIDES, ALONG BUNGCALALON RIVER, IGPIT, OPOL, MISAMIS ORIENTAL is a DPWH-tracked public work in Region X, Region X. Reported contract value: ₱119,172,343.41. Status: Reported complete (DPWH). Contractor on record: UKC BUILDERS INC. Figures trace to dpwh.
Total Contract Cost
