Buildings and Facilities17DG0081

CONST OF THREE (3) STOREY SIX (6) CL SB @ PACHECO E/S, MAGALLANES, CAVITE

CONST OF THREE (3) STOREY SIX (6) CL SB @ PACHECO E/S, MAGALLANES, CAVITE is a DPWH-tracked public work in Cavite 2nd DEO, Region IV-A. Reported contract value: ₱14,222,586.05. Status: Reported complete (DPWH). Contractor on record: ONE EULUZ CONST CORP FORMERLY: EULUZ CONST. Figures trace to dpwh.

Cavite 2nd DEO, Region IV-A
Region: Region IV-A

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Improvement of Flood Control Structures at Pinagpatayan River, Brgy. Sapang II, Ternate, Cavite
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-17-0010836

₱277,253.00 · FY2017

Released to Salvacion National High School - Bato (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

25 projects · ₱182.0M total · 0 flags

Other projects by this contractor

No sat.

REHABILITATION OF MULTIPURPOSE BUILDING , BRGY. ACACIA, SILANG, CAVITE, CONSTRUCTION OF MULTIPURPOSE BUILDING , ZONE 1, BRGY. OLD BULIHAN, SILANG, CAVITE, CONSTRUCTION/ REHABILITATION OF BARANGAY HALL BUILDING , BRGY. LITLIT, SILANG, CAVITE, CONSTRUCTION

Region IV-A, Region IV-A

2018₱18.9M
Reported complete (DPWH)
No sat.

REHABILITATION OF MULTIPURPOSE BUILDING (COVERED COURT), BRGY. BALUBAD, SILANG, CAVITE, REHABILITATION OF MULTIPURPOSE BUILDING (COVERED COURT), BRGY. POOC L, SILANG, CAVITE, CONSTRUCTION OF MULTIPURPOSE BUILDING (COVERED COURT), ZONE 10, BRGY. BULIHAN, S

Region IV-A, Region IV-A

2018₱18.4M
Reported complete (DPWH)
No sat.

CONST OF FOUR (4) STOREY - EIGHT (8) CL SB @ PALANGUE 3, E/S, NAIC, CAVITE

Cavite 2nd DEO, Region IV-A

2017₱17.5M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM LOCAL INFRASTRUCTURE PROGRAM LOCAL ROADS AND BRIDGES LOCAL ROADS CONCRETING OF ROAD, BRGY. PASONG LANGKA, SILANG, CAVITE, CONCRETING OF ROAD BRGY. DELAS ALAS, GENERAL MARIANO, ALVAREZ, CAVITE AND LOCAL PROGRAM CONSTRUCTION/ REPAIR/

Region IV-A, Region IV-A

2018₱14.1M
Reported complete (DPWH)
No sat.

LOCALLY FUNDED PROJECTS - LOCAL INFRASTRUCTURE PROGRAM (LIP) - ROADS AND BRIDGES - LOCAL BRIDGES AND LOCAL ROADS - COMPLETION OF FOOT BRIDGE, MALIA, GMA, CAVITE, CONCRETING OF ROAD, ADLAS, SILANG, CAVITE, CONCRETING OF ROAD, POBLACION I, GMA, CAVITE, CONC

Cavite 3rd DEO, Region IV-A

2017₱11.3M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL & DRAINAGE - DRAINAGE PROTECTION WORKS - CONSTRUCTION OF DRAINAGE SYSTEM (SAN PABLO ST. COVERED CANAL), BRGY. 1, CARMONA, CAVITE, CONSTRUCTION OF DRAINAGE SYSTEM, BRGY. PUTING KAHOY, SILANG ,CAV

Region IV-A, Region IV-A

2018₱10.3M
Reported complete (DPWH)
View all 25 projects →

4. Implementation

Contract Amount

₱14,222,586.05

Progress

Reported complete (DPWH)

Start Date

November 27, 2017

Target End

April 25, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.