FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG TINAPIAN RIVER, STA. 0+965 - STA. 1+347 (UPSTREAM, LEFT SIDE AND RIGHT SIDE), NET LENGTH = 764.00 L.M., BA
FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG TINAPIAN RIVER, STA. 0+965 - STA. 1+347 (UPSTREAM, LEFT SIDE AND RIGHT SIDE), NET LENGTH = 764.00 L.M., BA is a DPWH-tracked public work in Masbate 2nd DEO, Region V. Reported contract value: ₱48,993,705.26. Status: Reported complete (DPWH). Contractor on record: SPRING STAR CONST AND SUPPLY. Figures trace to dpwh.
Total Contract Cost
