CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SOLONG RIVER CONTROL, SAN MIGUEL, CATANDUANES
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SOLONG RIVER CONTROL, SAN MIGUEL, CATANDUANES is a DPWH-tracked public work in Catanduanes DEO, Region V. Reported contract value: ₱19,007,367.15. Status: Reported complete (DPWH). Contractor on record: HI-TONE CONST. Figures trace to dpwh.
Total Contract Cost
