Bridges25F00251

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-CONSTRUCTION OF NEW BRIDGES-VIADUCT BR. ALONG MAHARLIKA HIGHWAY (LZ) (PACKAGE 3), LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT)

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-CONSTRUCTION OF NEW BRIDGES-VIADUCT BR. ALONG MAHARLIKA HIGHWAY (LZ) (PACKAGE 3), LIBMANAN, CAMARINES SUR (2ND LEGISLATIVE DISTRICT) is a DPWH-tracked public work in Region V, Region V. Reported contract value: ₱153,466,882.14. Status: Past target date (DPWH On-Going). Contractor on record: HGG BUILDERS. Figures trace to dpwh.

Region V, Region V
Region: Region V

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2025 GAA. DBM GAA FY2025

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

Confirmed (exact contract ID) · 100%

25F00251

₱153,466,882.14 · HGG BUILDERS AND SUPPLY

Confirmed (exact contract ID) · 100%

25F00251

₱153,466,882.14 · HGG BUILDERS AND SUPPLY

Contractor

C

233 projects · ₱17.1B total · 0 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENTRESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG ESTRELLA, STA. 000+000-STA. 000+616.85, NAUJAN, OR. MINDORO

Region IV-B, Region IV-B

2025₱277.2M
Past target date (DPWH On-Going)
No sat.

CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, (UPSTREAM), BRGY. MULAWIN-BRGY. DEL PILAR, NAUJAN,

Region IV-B, Region IV-B

2025₱276.0M
Past target date (DPWH On-Going)
No sat.

CLUSTER 22: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- REHAB. OF ROAD WITH SLIPS, SLOPE CIOLLAPSE AND LANDSLIDE ALONG TAYTAY-BANTULAN-STA. CRUZ PORT ROAD, 22.1: STA. 1+026-STA. 1+161 (R/S); 22.2: STA. 1+057-STA. 1+164 (L/S); 22.3: STA.

Region IV-B, Region IV-B

2022₱252.4M
Past target date (DPWH On-Going)
No sat.

OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, POBLACION SAWANG, RIGHT SIDE PHASE 1, LOBOC,

Region VII, Region VII

2024₱241.2M
Past target date (DPWH On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF MOGPOG SHORE PROTECTION/BOULEVARD, MOGPOG, MARINDUQUE

Region IV-B, Region IV-B

2024₱241.2M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF LIPA-MATAAS NA KAHOY ROAD INCLUDING URBAN DRAINAGE DEVELOPMENT AND ROAD SAFETY DEVICES, BATANGAS

Region IV-A, Region IV-A

2023₱241.2M
Past target date (DPWH On-Going)
View all 233 projects →

4. Implementation

Contract Amount

₱153,466,882.14

Progress

Past target date (DPWH On-Going)

Start Date

September 18, 2025

Target End

September 11, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.