GAA 2025 OO-125PB0024

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ROADS-SECONDARY ROADS, KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD-K0591+068-K0591+110, K0597+355-K0597+468

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ROADS-SECONDARY ROADS, KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD-K0591+068-K0591+110, K0597+355-K0597+468 is a DPWH-tracked public work in Apayao 1st DEO, Cordillera Administrative Region. Reported contract value: ₱3,868,867.69. Status: Past target date (DPWH On-Going). Contractor on record: AY-CA CONST SUPPLY 55395. Figures trace to dpwh.

Apayao 1st DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱85,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Matalag (Downstream) Flood Mitigation Structures, STA. 33+288 - STA. 34+248, with exceptions, Conner, Apayao
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Apayao 1st DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 55395

10 projects · ₱95.0M total · 0 flags

Other projects by this contractor

No sat.

CONCRETING OF BRGY. KARAGAWAN FMR, BRGY. KARAGAWAN,KABUGAO,APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2024₱24.7M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE- SECONDARY ROADS, CONNER- KABUGAO RD- K0593+230-K0593+334

Apayao 1st DEO, Cordillera Administrative Region

2025₱19.4M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM(BIP)- MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI PURPOSE BUILDING,(EVACUATION CENTER), BARANGAY PUGUIN, CONNER, APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2024₱9.8M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM(BIP), BIP-MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, (DEPED ADMIN BUILDING) KAIHS, LUTTUACAN KABUGAO,APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2024₱9.7M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOM UNDER THE DEPED'S BASIC EDUCATION FACILITIES FUND: CONSTRUCTION OF 1-STOREY 3-CLASSROOM SCHOOL BUILDING MUSIMUT NATIONAL HIGH SCHOOL, BARANGAY MUSIMUT, KABUGAO, APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2024₱9.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANSLIDE-TERTIARY ROADS-PAYAO-ILOCOS NORTE ROAD-K0610+100-K0610+132

Apayao 1st DEO, Cordillera Administrative Region

2025₱5.8M
Past target date (DPWH On-Going)
View all 10 projects →

4. Implementation

Contract Amount

₱3,868,867.69

Progress

Past target date (DPWH On-Going)

Start Date

June 20, 2025

Target End

September 23, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.