Roads23PB0038

BASIC INFRASTRUCTURE PROGRAM(BIP)- ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF ROAD, BRGY. CAGLAYAN-MAUBBA TO MAKATEL, CONNER, APAYAO

BASIC INFRASTRUCTURE PROGRAM(BIP)- ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF ROAD, BRGY. CAGLAYAN-MAUBBA TO MAKATEL, CONNER, APAYAO is a DPWH-tracked public work in Apayao 1st DEO, Cordillera Administrative Region. Reported contract value: ₱49,500,000.00. Status: Reported complete (DPWH). Contractor on record: BAHRAMLEY CONST. Figures trace to dpwh.

Apayao 1st DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Barren River (Downstream) Flood Control along Chico River Basin, Sta. 37 + 414 - Sta. 37 + 664 (R/S), Barangay Paddaoan, Conner, Apayao
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Apayao 1st DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

31 projects · ₱343.7M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF DALIMUNO, BANTAY FLOOD CONTROL ALONG CHICO RIVER (STA. 100+023 - STA. 100+430), BANTAY, TABUK CITY, KALINGA

Cordillera Administrative Region, Cordillera Administrative Region

2024₱96.5M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF MASABLANG-RAGAS-CALLUGAYAN ROAD, BARANGAY MASABLANG, TABUK CITY, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2022₱24.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF TOMIANGAN FLOOD CONTROL, DUPAG, TABUK CITY, KALINGA

Upper Kalinga DEO, Cordillera Administrative Region

2020₱24.3M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF ROAD, KATAO LACNOG TO ANUNANG, LIWAN WEST, RIZAL ROAD, LACNOG, TABUK CITY, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2019₱19.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF DUPAG PROPER FLOOD CONTROL ALONG CHICO RIVER, BRGY. DUPAG, TABUK CITY, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2019₱17.5M
Reported complete (DPWH)
No sat.

Construction of Barren River (Upstream) Flood Control Structure, Sta. 39 + 693 - Sta. 39 + 893 (R/S), Brgy. Ili, Conner, Apayao

CONNER (APAYAO), APAYAO, Cordillera Administrative Region

2022₱15.7M
Reported complete (DPWH)
View all 31 projects →

4. Implementation

Contract Amount

₱49,500,000.00

Progress

Reported complete (DPWH)

Start Date

May 22, 2023

Target End

March 28, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.