FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURE/ FACIITIES-LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY MALASSA, BONGAO, TAWI-TAWI
FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURE/FACIITIES-LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY MALASSA, BONGAO, TAWI-TAWI is a DPWH-tracked public work in Region IX, Region IX. Reported contract value: ₱19,596,640.00. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: LVRO CONST. Figures trace to dpwh.
Total Contract Cost
