ORG OUTCOME 2 : PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGMT PROG-CONST/ MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYS-CONSTRUCTION OF RIVERBANK PROTECTION ALONG BINAMBANG RIVER,STA.1+072.00 - STA.1+390.80 (UPSTREAM L/S) AT BALAYAN,BAT
ORG OUTCOME 2 : PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGMT PROG-CONST/ MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYS-CONSTRUCTION OF RIVERBANK PROTECTION ALONG BINAMBANG RIVER,STA.1+072.00 - STA.1+390.80 (UPSTREAM L/S) AT BALAYAN,BAT is a DPWH-tracked public work in Batangas 1st DEO, Region IV-A. Reported contract value: ₱84,242,509.20. Status: Past target date (DPWH On-Going). Contractor on record: FRANDEL CONST AND DEVELOPMENT CORP. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
