Construction of Bongabong River Control, Sta. 2+320 - Sta. 2+798(Downstream - Right Side), Barangay Anilao, Bongabong, Oriental Mindoro
Construction of Bongabong River Control, Sta. 2+320 - Sta. 2+798(Downstream - Right Side), Barangay Anilao, Bongabong, Oriental Mindoro is a DPWH-tracked public work in BONGABONG (ORIENTAL MINDORO), ORIENTAL MINDORO, Region IV-B. Reported contract value: ₱67,547,158.37. Status: Reported complete (DPWH). Contractor on record: LUMEL GLENN CONST. Figures trace to sumbong.
Total Contract Cost
