LUMEL GLENN CONST is listed as a company organization in Philippine public procurement records on this site, with 181 linked DPWH project(s) totaling about ₱4,472,112,204.65. Recorded delivery grade A (from public DPWH project records — not a finding of wrongdoing).
LUMEL GLENN CONST
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 181
- Total value
- ₱4,472,112,204.65
- Published flags
- 0
- Region
- Southern Mindoro DEO · Region IV-B
Licensed officers (PCAB)
- Lumelito M. Cabagay · Authorized Managing Officer (PCAB license 26817) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for LUMEL GLENN CONST — not an accusation or finding of wrongdoing.
Score: 90.40 / 100 · Projects in sample: 181 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 85.3/100 · Weight: 50%
- graceDays
- 30
- componentScore
- 85.3
- lateCompletedProjects
- 8
- onTimeCompletedProjects
- 158
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 178
- pastTargetOngoingProjects
- 12
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 95/100 · Weight: 22%
- totalProjects
- 181
- componentScore
- 95
- terminatedProjects
- 3
- terminationRatePct
- 1.7
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 22%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 179
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 181
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
Component score: 99.9/100 · Weight: 6%
- projects
- 181
- componentScore
- 99.9
- linkedObservations
- 1
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 47 of 151 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS- CALAPAN SOUTH ROAD- K0069+180-K0127+931 (INTERMITTENT SECTIONS), SOUTHERN MINDORO24E00101 · ₱181,162,996.48 · mapped
- REHAB./CONCRETING OF PINAGSABANGAN BEACH ROAD INCLUDING DRAINAGE, STA. 2+799.00-STA. 6+929.76; STA. 7+409.87-STA. 8+046.49, ORIENTAL MINDORO18E00061 · ₱134,438,665.63 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-CONST. OF STA. MARIA TO MANGUYANG ROAD, STA. 2+260-STA. 2+514.76, STA. 2+900-STA. 3+637.95, STA. 4+490.21-STA. 8+470, GLORIA, OR. MINDORO22E00060 · ₱107,109,027.29 · mapped
- ROAD WIDENING OF CALAPAN SOUTH ROAD, KO064+(-933.00)-KO064+(-780); KO087+721-KO087+863; KO102+237-KO102+550; KO146+750-KO147+064; KO161+854-KO163+000, ORIENTAL MINDORO21E00035 · ₱97,725,272.88 · mapped
- ASSE PRESERVATION PROGRAM- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-SECONDARY ROADS, CALAPAN SOUTH ROAD, K0064+833 - K0067+424, ORIENTAL MINDORO23E00114 · ₱96,822,011.13 · mapped
- CONSTRUCTION OF BULALACAO PUBLIC MARKET, BULALACAO, ORIENTAL MINDORO22EI0114 · ₱96,499,909.45 · mapped
- REHAB./RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE CSR (K0119+060 - K0119+436, K0160+540 - K0160+836 & K0161+542 - K0161+823, BONGABONG - MANSALAY, ORIENTAL MINDORO17EI0039 · ₱92,677,898.78 · mapped
- Construction of Flood Control Structure along Baroc River, Sta. Brigida, Mansalay, Oriental Mindoro23EI0023 · ₱82,022,349.10 · mapped
- Construction of Baroc River Control Structure, Brgy. San Mariano Section, Roxas, Oriental Mindoro23EI0022 · ₱82,022,284.76 · mapped
- ROAD WIDENING-SECONDARY ROADS BONGABONG-SAGANA-ROXAS-SAN AQUILINO ROAD- K0119+103.00-K0121+000.00, K0122+421.00-K0122+474.00, BONGABONG, ORIENTAL MINDORO25EI0005 · ₱80,177,234.52 · mapped
- UPGRADING/CONC. OF NATL RDS CAWACAT JCT-BALATASAN RD. LEADING TO WHITE SAND COVES & VARIOUS BEACHES16E00036 · ₱78,154,468.65
- Construction of Bongabong River Control, Sta. 2+320 - Sta. 2+798(Downstream - Right Side), Barangay Anilao, Bongabong, Oriental Mindoro24EI0020 · ₱67,547,158.37 · mapped
- Construction of Pula River Control, Sta. 9+070 - Sta. 9+490, (Upstream - Left Side), Barangay Pambisan Malaki, Pinamalayan, Oriental Mindoro24EI0021 · ₱67,547,027.84 · mapped
- WIDENING OF PERMANENT BRIDGES: BANSUD BR. (B00046MR) ALONG CALAPAN SOUTH ROAD, BANSUD, ORIENTAL MINDORO22EI0081 · ₱67,142,371.97 · mapped
- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS, CSR (K0130+420 - K0130+800, K0132+350 - K0133+463, K0141+364 - K0142+726, K0165+673 - K0166+098, K0167+060 - K0167+839, K0168+861 - K0168+940, K0170+930 - K0171+184, K0175+956 - K017618EI0088 · ₱66,739,226.50 · mapped
- ROAD WIDENING - SECONDARY ROADS ALONG CALAPAN SOUTH ROAD - K0132+350 - K0133+159, K0136+185 - K0137+458, ROXAS, ORIENTAL MINDORO20EI0105 · ₱63,742,026.06 · mapped
- ROAD WIDENING - SECONDARY ROADS - CALAPAN SOUTH ROAD K0111+459 - K0113+000, BONGABONG, ORIENTAL MINDORO23EI0030 · ₱57,831,351.24 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SAN MARIANO RIVER CONTROL STRUCTURE, ROXAS, ORIENTAL MINDORO18EI0058 · ₱48,999,974.15 · mapped
- Construction of Baroc River Control, Brgy. San Aquilino Section, Sta. 0+000 - Sta. 0+796, Roxas, Oriental Mindoro22EI0017 · ₱48,999,931.65 · mapped
- CONSTRUCTION OF SUMAGUI RIVER CONTROL (DOWNSTREAM), BANSUD, ORIENTAL MINDORO21EI0040 · ₱48,999,925.01 · mapped
- Construction of Orconuma River Control (Upstream), Abutment B, Bongabong, Oriental Mindoro23EI0047 · ₱48,999,818.34 · mapped
- Construction of Bansud River Control, Sta. 0+000 - Sta. 0+670, Bansud, Oriental Mindoro22EI0022 · ₱48,999,734.76 · mapped
- CONSTRUCTION OF BONGABONG RIVER CONTROL, BARANGAY LUNA SECTION, BONGABONG, ORIENTAL MINDORO21EI0039 · ₱48,999,624.20 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE/GABION ARMOURING AT MALAMIG RIVER, GLORIA, ORIENTAL MINDORO20EI0038 · ₱48,999,608.98 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF PAGALAGALA RIVER CONTROL, PINAMALAYAN, ORIENTAL MINDORO20EI0086 · ₱48,999,322.09 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF MARAYOS - SABANG ROAD, PINAMALAYAN, ORIENTAL MINDORO24EI0039 · ₱48,997,948.06 · mapped
- Construction of Madugo I River Control, Barangay Malaya Section, Roxas, Oriental MIndoro24EI0074 · ₱48,997,656.29 · mapped
- Construction of Banus River Control, Barangay Malayong-Barangay Manguyang Section, Gloria, Oriental Mindoro24EI0072 · ₱48,997,248.42 · mapped
- Construction of Baroc River Control, Barangay Roma, Sitio Angaran Section, Mansalay, Oriental Mindoro23EI0033 · ₱48,997,147.81 · mapped
- Construction of Baroc River Control, Brgy. Sta. Brigida Section, Sta. 0+000 - Sta. 0+770, Mansalay, Oriental Mindoro22EI0018 · ₱48,996,447.00 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF STA. ISABEL - GUINHAWA ROAD, PINAMALAYAN, ORIENTAL MINDORO24EI0041 · ₱48,995,052.12 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITH MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF BALITE RIVER CONTROL STRUCTURE, GLORIA, ORIENTAL MINDORO18EI0001 · ₱48,802,483.13 · mapped
- Construction of Balite River Control Structure, Brgy. Manguyang Section, Gloria, Oriental Mindoro22EI0087 · ₱47,764,451.36 · mapped
- CONSTRUCTION OF ARMY CAMP ROAD, BANSUD, ORIENTAL MINDORO25EI0157 · ₱47,706,402.73 · mapped
- Construction of Seawall at Barangay Balatasan, Bulalacao, Oriental Mindoro23EI0028 · ₱47,701,895.21 · mapped
- TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM (TIKAS)- CONST./IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY- CONST. OF ARMORY AT 203RD BRIGADE PHILIPPINE ARMY AT BRGY. PAG-ASA, BANSUD, OR. MINDORO24E00189 · ₱47,283,009.50
- WIDENING OF PERMANENT BRIDGES- ORCONUMA BR. (B00217MR) ALONG BONGABONG-SAGANA-ROXAS-SAN AQUILINO ROAD (PHASE II), BONGABONG, OR. MINDORO25E00156 · ₱46,705,320.55 · mapped
- CONSTRUCTION OF LONGOS RIVER CONTROL, CALAPAN CITY, ORIENTAL MINDORO16ED0007 · ₱46,024,617.74
- REPAIR/REHABILITATION OF GUTAD FLOOD CONTROL, CALAPAN CITY, ORIENTAL MINDORO19ED0149 · ₱45,986,003.02 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE CSR JCT. MINAS ROAD K0035+(-526) - K0035+000, K0040+950 - K0041+765, K0042+000 - K0042+615, K0042+791 - K0043+656, K0043+740 - K0043+756.50, VICTORIA, ORIENTAL MINDORO17ED0029 · ₱45,799,686.18 · mapped
- CONSTRUCTION OF DULANGAN RIVER CONTROL (GABIONS), BACO, ORIENTAL MINDORO17ED0019 · ₱45,686,819.86 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF ROAD, BALATASAN - SITIO BORBO ROAD, BULALACAO, ORIENTAL MINDORO25EI0051 · ₱44,077,432.19 · mapped
- CONSTRUCTION OF DEL PILAR RIVER CONTROL (GABION), STA. 0+000 - STA. 0+680, NAUJAN, ORIENTAL MINDORO 1ST LD, NAUJAN, ORIENTAL MINDORO17ED0018 · ₱42,494,270.00 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF BAROC RIVER FLOOD CONTROL STRUCTURE, BARANGAY SAN AQUILINO, ROXAS, ORIENTAL MINDORO25EI0024 · ₱42,303,636.78 · mapped
- CONST. OF RIVER CONTROL (REVETMENT WALL) ALONG AKLAN RIVER INCL. OTHER STRUCTURES/FACILITIES, LEZO,18GA0002 · ₱41,806,761.47 · mapped
- CONCRETING OF ROAD AT BULALACAO, ORIENTAL MINDORO21EI0164 · ₱40,007,503.35 · mapped
- CONCRETING OF PAWIKAN - UPPER YUNOT ACCESS ROAD, NASUCOB, BULALACAO, ORIENTAL MINDORO20EI0160 · ₱39,198,732.29 · mapped
- ROAD WIDENING - SECONDARY ROADS, CALAPAN SOUTH ROAD K0156+194 - K0157+140, K0157+662.00 - K0158+000.00, MANSALAY, ORIENTAL MINDORO20EI0111 · ₱38,983,581.74 · mapped
- CONCRETING OF ROAD, PANGGULAYAN - ANOLING - BULI, PINAMALAYAN, ORIENTAL MINDORO20EI0186 · ₱38,599,674.21 · mapped
- Construction of Bucayao River Control Calapan City22ED0115 · ₱38,392,547.71 · mapped
Equipment & capacity
PCAB license
- License no.
- 26817
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Jun 29, 2028
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 26817); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
16 evaluations listed across 6 GPPB CPES releases; average final rating 92.3% over 6 rated projects; 16 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jul 26, 2025 | DPWH | ₱42,303,636.00 | On-going | 82.7% | — | 40th, p. 190 |
| Jul 23, 2025 | DPWH | ₱19,427,710.00 | On-going | 92.3% | — | 40th, p. 190 |
| May 5, 2025 | DPWH | 4.746 (₱ thousands, as printed; flagged) | Completed | 93.7% | 95.1% | 40th, p. 190 |
| May 2, 2025 | DPWH | ₱53,075.00 | Completed | 100.0% | 92.9% | 40th, p. 190 |
| Feb 14, 2025 | DPWH | ₱48,997,248.00 | Completed | 93.0% | 89.8% | 39th (rev), p. 127 |
| Oct 19, 2024 | DPWH | ₱48,995,052.00 | On-going | 95.3% | — | 39th (rev), p. 127 |
| Aug 15, 2024 | DPWH | ₱67,547,028.00 | On-going | 96.0% | — | 38th, p. 145 |
| May 23, 2024 | DPWH | ₱48,997,148.00 | Completed | 96.7% | 93.6% | 38th, p. 145 |
| May 22, 2024 | DPWH | ₱65,547,158.00 | On-going | 88.2% | — | 38th, p. 145 |
| Sep 5, 2023 | DPWH | ₱48,997,148.00 | On-going | 94.5% | — | 36th, p. 127 |
| Sep 5, 2023 | DPWH | ₱37,238,494.00 | Final | 94.9% | 93.9% | 36th, p. 127 |
| May 24, 2023 | DPWH | ₱48,997,236.00 | On-going | 88.5% | — | 36th, p. 127 |
Showing the 12 most recent of 16.
1 amount flagged: the printed value is implausible for a ₱-thousands column or disagrees with the DPWH award, so we show it as printed instead of converting it.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →