Construction of Orconuma River Control (Upstream), Abutment B, Bongabong, Oriental Mindoro
Construction of Orconuma River Control (Upstream), Abutment B, Bongabong, Oriental Mindoro is a DPWH-tracked public work in BONGABONG (ORIENTAL MINDORO), ORIENTAL MINDORO, Region IV-B. Reported contract value: ₱48,999,818.34. Status: Reported complete (DPWH). Contractor on record: LUMEL GLENN CONST. Figures trace to sumbong.
Total Contract Cost
