Roads25CG0023

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF BY-PASS ROAD AND BRIDGE (SAN ESTEBAN) MACABEBE - MALAULI (PHASE IV), MASANTOL, PAMPAN

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF BY-PASS ROAD AND BRIDGE (SAN ESTEBAN) MACABEBE - MALAULI (PHASE IV), MASANTOL, PAMPAN is a DPWH-tracked public work in Pampanga 1st DEO, Region III. Reported contract value: ₱44,013,617.84. Status: Past target date (DPWH On-Going). Contractor on record: QUANTUMWAYS BUILDERS ROAD CONST. Figures trace to dpwh.

Pampanga 1st DEO, Region III
Region: Region III

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Pampanga River, (Downstream-Left Bank), Barangay Consuelo, Macabebe, Pampanga
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Pampanga 1st DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

10 projects · ₱182.8M total · 0 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF BYPASS ROAD (SAN ESTEBAN) MACABEBE - MALAULI, MASANTOL, PAMPANGA

Pampanga 1st DEO, Region III

2022₱25.7M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF SAPANG ARE CREEK, APALIT, PAMPANGA (PHASE II)

Pampanga 1st DEO, Region III

2022₱25.7M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF SAPANG ARE CREEK, APALIT, PAMPANGA (PHASE I)

Pampanga 1st DEO, Region III

2022₱25.7M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF CANDABA - SAN MIGUEL, BULACAN ROAD (CANDABA SECTION) CANDABA, PAMP

Pampanga 1st DEO, Region III

2022₱23.3M
Reported complete (DPWH)
No sat.

BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - SULIPAN BR. (B04209LZ) ALONG MANILA NORTH ROAD

Pampanga 1st DEO, Region III

2023₱19.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM; SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR STRATIGIC PUBLIC BUILDINGS/FACILITIES; IMPROVEMENT/REHABILITATION OF ROAD AND DRAINA

Pampanga 3rd DEO, Region III

2023₱9.8M
Reported complete (DPWH)
View all 10 projects →

4. Implementation

Contract Amount

₱44,013,617.84

Progress

Past target date (DPWH On-Going)

Start Date

May 22, 2025

Target End

December 8, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.