Construction of Flood Mitigation Structure23JI0012

Construction of Flood Control Structure (revetment wall) along Sibuguey River (upstream), Barangay Sampoli A, Diplahan, Zamboanga Sibugay (Package 1)

Construction of Flood Control Structure (revetment wall) along Sibuguey River (upstream), Barangay Sampoli A, Diplahan, Zamboanga Sibugay (Package 1) is a DPWH-tracked public work in DIPLAHAN (ZAMBOANGA SIBUGAY), ZAMBOANGA SIBUGAY, Region IX. Reported contract value: ₱57,843,164.86. Status: Reported complete (DPWH). Contractor on record: LONG ISLAND BUILDERS & CONST. Figures trace to sumbong.

DIPLAHAN (ZAMBOANGA SIBUGAY), ZAMBOANGA SIBUGAY, Region IX
Region: Region IX

Money Trail

1. Appropriation

Probable match · score 98%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure (revetment wall) along Sibuguey River (upstream), Sta. 0+000.00 - Sta. 0+417.00, Barangay Sampoli A, Diplahan, Zamboanga Sibugay (Package 2)
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Zamboanga Sibugay 1st District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

23 projects · ₱1.5B total · 1 flags

Other projects by this contractor

No sat.

CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PULIRAN RIVER, PULIRAN BR. SECTION PACKAGE 1, SIBUCO, ZAMBOANGA DEL NORTE

Region IX, Region IX

2024₱162.3M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG DIPOLOG RIVER, POBLACION NORTH SECTION, BARANGAY POBLACION NORTH, POLANCO, ZAMBOANGA DEL NORTE

Region IX, Region IX

2025₱153.7M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAYAWAN RIVER, DAPDAP BRIDGE UPSTREAM, POLANCO, ZAMBOANGA DEL NORTE

Region IX, Region IX

2025₱153.7M
Past target date (DPWH On-Going)

CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DIPOLOG RIVER, (SIANIB SECTION), POLANCO ZAMBOANGA DEL NORTE

Region IX, Region IX

2024₱149.6M
Reported complete (DPWH)

CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DIPOLOG RIVER, (CONACON-GUINLES SECTION), POLANCO ZAMBOANGA DEL NORTE

Region IX, Region IX

2024₱149.6M
Reported complete (DPWH)

Construction of Riverwall, Barangay Balagon, Siay, Zamboanga Sibugay

SIAY (ZAMBOANGA SIBUGAY), ZAMBOANGA SIBUGAY, Region IX

2022₱96.0M
Reported complete (DPWH)
View all 23 projects →

4. Implementation

Contract Amount

₱57,843,164.86

Progress

Reported complete (DPWH)

Start Date

March 20, 2023

Target End

November 18, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.