Roads24AA0248

BIP-ACCESSROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADINGTO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -CONSTRUCTION OF ROAD BARANGAY UTOL, BANGUI, ILOCOSNORTE

BIP-ACCESSROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADINGTO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -CONSTRUCTION OF ROAD BARANGAY UTOL, BANGUI, ILOCOSNORTE is a DPWH-tracked public work in Ilocos Norte 1st DEO, Region I. Reported contract value: ₱4,828,710.51. Status: Past target date (DPWH On-Going). Contractor on record: GESAVILE CONST. Figures trace to dpwh.

Ilocos Norte 1st DEO, Region I
Region: Region I

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Sarrat Padsan River from Sarrat Bridge to Rivermount, Barangay 18 San Isidro, Sarrat, Ilocos Norte
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Ilocos Norte 1st DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

30 projects · ₱90.7M total · 0 flags

4. Implementation

Contract Amount

₱4,828,710.51

Progress

Past target date (DPWH On-Going)

Start Date

March 22, 2024

Target End

May 2, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.