FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF LUMBANG RIVER FLOOD CONTROL, STA. 3+758 - STA. 4+100 (UPSTREAM, RIGHT SIDE), STA.3+758 - STA.4+100 (UPSTREAM, LEFT SIDE), NET LENGTH
FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF LUMBANG RIVER FLOOD CONTROL, STA. 3+758 - STA. 4+100 (UPSTREAM, RIGHT SIDE), STA.3+758 - STA.4+100 (UPSTREAM, LEFT SIDE), NET LENGTH is a DPWH-tracked public work in Masbate 2nd DEO, Region V. Reported contract value: ₱48,999,947.22. Status: Reported complete (DPWH). Contractor on record: A C RIVERO DEVELOPMENT CORP. Figures trace to dpwh.
Total Contract Cost
