Construction of Quidaoen - Cabcaburao Flood Control Structure (Phase 2), Barangay Quidaoen to Barangay Cabcaborao, San Juan, Abra
Construction of Quidaoen - Cabcaburao Flood Control Structure (Phase 2), Barangay Quidaoen to Barangay Cabcaborao, San Juan, Abra is a DPWH-tracked public work in SAN JUAN (ABRA), ABRA, Cordillera Administrative Region. Reported contract value: ₱49,498,154.00. Status: Reported complete (DPWH). Contractor on record: ST TIMOTHY CONST CORP. Figures trace to sumbong.
Total Contract Cost



