Rehabilitation of Flood Control Structure along Cagayan River (Phase 2), Gattaran, Cagayan
Rehabilitation of Flood Control Structure along Cagayan River (Phase 2), Gattaran, Cagayan is a DPWH-tracked public work in GATTARAN (CAGAYAN), CAGAYAN, Region II. Reported contract value: ₱22,530,000.00. Status: Reported complete (DPWH). Contractor on record: TJMT CONST. Figures trace to sumbong.
Total Contract Cost

