Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River Control Left Dike, Sta. Maria - San Bartolome Section, Tarlac (Package D)
Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River Control Left Dike, Sta. Maria - San Bartolome Section, Tarlac (Package D) is a DPWH-tracked public work in CONCEPCION (TARLAC), TARLAC, Region III. Reported contract value: ₱57,189,172.97. Status: Reported complete (DPWH). Contractor on record: T2B3 BUILDERS AND SUPPLIES CORP. Figures trace to sumbong.
Total Contract Cost




