Construction of Flood Control Structure along Labong River, Barangay San Cristobal, Licab, Nueva Ecija
Construction of Flood Control Structure along Labong River, Barangay San Cristobal, Licab, Nueva Ecija is a DPWH-tracked public work in LICAB (NUEVA ECIJA), NUEVA ECIJA, Region III. Reported contract value: ₱24,254,959.80. Status: Reported complete (DPWH). Contractor on record: AMP 723 CONST CORP FORMERLY: A M P CONST. Figures trace to sumbong.
Total Contract Cost

