CONSTRUCTION OF FLOOD MITIGATION STRUCTURE CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DIONUM BRIDGE UPSTREAM (PIÑAN-MUTIA ROAD) DIPOLOG RIVER, PIÑAN, ZN
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DIONUM BRIDGE UPSTREAM (PIÑAN-MUTIA ROAD) DIPOLOG RIVER, PIÑAN, ZN is a DPWH-tracked public work in Zamboanga del Norte 1st DEO, Region IX. Reported contract value: ₱23,761,543.70. Status: Reported complete (DPWH). Contractor on record: MONTAÑO CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
