MONTAÑO CONST is listed as a company organization in Philippine public procurement records on this site, with 158 linked DPWH project(s) totaling about ₱10,633,245,420.88. Recorded delivery grade C (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
MONTAÑO CONST
CGrade by Love the Philippines based on public DPWH project records. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 158
- Total value
- ₱10,633,245,420.88
- Published flags
- 0
- Region
- Region IX · Region IX
Public Record Grade
A transparent, data-derived summary of reported public records for MONTAÑO CONST — not an accusation or finding of wrongdoing.
Score: 73.30 / 100 · Projects in sample: 158 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 50/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 50
- lateCompletedProjects
- 32
- onTimeCompletedProjects
- 76
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 146
- pastTargetOngoingProjects
- 38
- undatedCompletedProjectsExcluded
- 11
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 158
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 158
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 158
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 158
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 157 geotagged projects (largest by contract value) — Open full map
- ROAD WIDENING INCLUDING DRAINAGE OF DIPOLOG - OROQUIETA NATIONAL ROAD, ZAMBOANGA DEL NORTE, 3RD DEO, K1796+480.00 - K1801+000.00, K1801+000.00 - K1805+214.00 (NET LENGTH: 8,757.00 LN.M.)17J00041 · ₱253,511,030.40 · mapped
- WIDENING OF PERMANENT BRIDGES SINDANGAN BRIDGE (B00455MN) ALONG DIPOLOG - SINDANGAN - LILOY ROAD (PHASE II)22J00006 · ₱216,766,505.08 · mapped
- ROAD WIDENING INCLUDING DRAINAGE AND RROW ACQUISITION - DIPOLOG - OROQUIETA NATIONAL ROAD, ZAMBOANGA DEL NORTE 3RD DEO, K1810+975.00 - K1812+937.00, K1813+102.00 - K1814+400.00, K1814+400.00 - K1817+700.00, NET LENGTH: 13.12 LANE KM/6,560.00 LN.M./6.560 K18J00048 · ₱183,252,217.00 · mapped
- WIDENING OF PERMANENT BRIDGES - POLO PARALLEL BRIDGE ALONG JCT. POLO - DAPITAN PARK NATIONAL ROAD (PHASE II)20J00162 · ₱178,012,212.00 · mapped
- CONCRETING OF BITIBUT-UPPER/LOWER BAUTISTA,SAPANG DALAGA, MIS. OCC.17K00400 · ₱176,015,598.00 · mapped
- ROAD WIDENING INCLUDING DRAINAGE AND RROW ACQUISITION - DIPOLOG - PUNTA - DANSULLAN - SERGIO OSMEÑA - ZAMBOANGA DEL NORTE 3RD DEO, K1855+877.00 - K1862+900.00, NET LENGTH: 13.84 LANE KM/6,920.95 LN.M./6.921 KM18J00049 · ₱173,519,176.00 · mapped
- REPLACEMENT OF PERMANENT WEAK BRIDGES - DIONUM BRIDGE (BR01588MN) ALONG PIÑAN - MUTIA ROAD19J00036 · ₱163,670,121.00 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS ALONG DIPOLOG - SINDANGAN - LILOY ROAD24J00030 · ₱159,118,816.00 · mapped
- PAVING OF UNPAVED ROADS - SECONDARY ROADS LILOY - SIOCON ROAD23J00027 · ₱157,424,803.02 · mapped
- ROAD WIDENING - SECONDARY ROADS - LILOY-SIOCON RD25J00103 · ₱147,847,078.29 · mapped
- ROAD UPGRADING (UNPAVED TO PAVED) OF RIZAL - DAKAK - DAPITAN COASTAL LOOP ROAD, ZAMBOANGA DEL NORTE, K1834+380.00 - K1834+775.00, K1834+775.00 - K1835+866.42, K1836+454.89 - K1840+040.00, NET LENGTH = 5,071.53 LN.M.16J00019 · ₱143,468,982.75 · mapped
- ROAD UPGRADING (GRAVEL TO PAVED) OF EASTERN BOBONGAN - SOMINOT - MIDSALIP - DUMINGAG ROAD, ZAMBOANGA DEL SUR, (CHAINAGE:7028-9368) K1670+440.00 - K1672+780.00, (CHAINAGE:4334-6168) K1667+746.00 - K1669+580.00, (NET LENGTH: 4,174.00 LN.M.)17J00055 · ₱143,443,937.46 · mapped
- WIDENING OF PERMANENT BRIDGES - TALINGA BR. (B00458MN) ALONG DIPOLOG-SINDANGAN-LILOY RD (PHASE 1)23J00013 · ₱143,222,087.05 · mapped
- WIDENING OF PERMANENT BRIDGES - DIONUM PARALLEL BRIDGE ALONG PIÑAN-MUTIA ROAD21J00007 · ₱143,123,135.36 · mapped
- WIDENING OF PERMANENT BRIDGES - PIAO BRIDGE (B00454MN) ALONG DIPOLOG - SINDANGAN - LILOY ROAD, ZAMBOANGA DEL NORTE21J00057 · ₱143,044,894.51 · mapped
- WIDENING OF PERMANENT BRIDGES - POLO PARALLEL BRIDGE ALONG JCT. POLO - DAPITAN PARK NATIONAL ROAD (PHASE III)21J00008 · ₱142,936,619.05 · mapped
- ROAD WIDENING - SECONDARY ROADS LILOY - SIOCON ROAD24J00031 · ₱142,644,653.40 · mapped
- WIDENING OF PERMANENT BRIDGES - SINDANGAN BR. (B00455MN) ALONG DIPOLOG-SINDANGAN-LILOY RD21J00058 · ₱139,693,110.07 · mapped
- CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER (UPSTREAM), SIOCON, ZAMBOANGA DEL NORTE, PACKAGE 124J00035 · ₱138,258,824.49 · mapped
- CONSTRUCTION OF BY - PASS ROAD INCLUDING R.O.W. OF AIRPORT - TURNO - SINAMAN BY-PASS ROAD, ZAMBOANGA DEL NORTE, STA. 0 + 600.00 TO STA. 8 + 194.44; NET LENGTH = 7,594.440 LN.M.16J00031 · ₱137,432,565.70 · mapped
- ROAD WIDENING - DIPOLOG - PUNTA - DANSULLAN - SERGIO OSMEÑA - ZAMBOANGA DEL NORTE/SUR BOUNDARY ROAD20J00056 · ₱136,187,758.00 · mapped
- CONSTRUCTION / REHABILITATION OF FLOOD CONTROL MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT DAPITAN RIVER, OPAO BRIDGE SECTION (B01784MN) (DOWNSTREAM) ALONG DIPOLOG-OROQUIETA ROAD (S013122J00025 · ₱134,656,950.52 · mapped
- ROAD WIDENING - PRIMARY ROADS - DIPOLOG - PUNTA - DANSULLAN - SERGIO OSMEÑA - ZAMBOANGA DEL NORTE/SUR BOUNDARY19J00044 · ₱130,380,535.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD - JCT. NATIONAL HIGHWAY - BRGY. MOROB, IN SUPPORT OF BAMBOO CRAFT, LEON B. POSTIGO, ZAMBOANGA DEL NORTE, STA. 0 + 491.67 - STA. 3 + 973.82, STA. 3 + 982.71 - STA. 6 + 760.00, NET LENGTH: 6,259.440 LN.M./12.51888 LANE KM18J00045 · ₱119,510,505.26 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS DIPOLOG-POLANCO-PIÑAN-JCT OROQUIETA ROAD20J00161 · ₱118,095,239.00 · mapped
- ROAD WIDENING - PRIMARY ROADS DIPOLOG - PUNTA - DANSULLAN - SERGIO OSMEÑA - ZAMBOANGA DEL NORTE/SUR BOUNDARY SO1056MN20J00020 · ₱117,658,089.00 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DIONUM BRIDGE (PIÑAN - MUTIA ROAD) DIPOLOG RIVER, ZAMBOANGA DEL NORTE21J00029 · ₱117,310,918.58 · mapped
- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/EXTENSION OF FLOOD CONTROL STRUCTURE ALONG DAPITAN RIVER, OPAO BRIDGE ABUT B, UPSTREAM, DAPITAN CITY, ZAMBOANGA DEL NORTE21J00031 · ₱113,873,825.36 · mapped
- CONST./IMPROVEMENT OF ACCESS ROAD LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, SITIO BOBONAO, ILAYA-BURGOS-TAMION-DIWA-AN ROAD IN SUPPORT TO COPRA INDUSTRY, DAPITAN CITY, ZAMBOANGA DEL NORTE20J00058 · ₱113,071,827.00 · mapped
- CONSTRUCTION OF BYPASS AND DIVERSION ROADS - AIRPORT - TURNO - SINAMAN BYPASS ROAD, ZAMBOANGA DEL NORTE20J00021 · ₱111,722,113.00 · mapped
- CONST. OF NEW PERMANENT ECUAN BR. & APPROACHES, ALONG EASTERN BOBONGAN-SOMINOT-MIDSALIP-DUMINGAG ROAD, ZAMBOANGA DEL SUR, STA.1669+580.00-STA.1670+440.00; ABUTMENT-A: STA. 1669+783.85; ABUTMENT-B: STA.1669+874.69 (BRIDGE LENGTH: 90.84 LN.M.)16J00050 · ₱111,516,172.00 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SINDANGAN RIVER, SINDANGAN BR. SECTION (B00455MN) (DOWNSTREAM) ALONG DIPOLOG-SINDANGAN-LILOY ROAD (S01057MN), ZAMBOANGA DEL NORTE22J00008 · ₱109,811,895.84 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SINDANGAN RIVER, PIAO BR. SECTION (B00454MN) ALONG DIPOLOG-SINDANGAN-LILOY ROAD (S01057MN), SINDANGAN, ZAMBOANGA DEL NORTE22J00007 · ₱109,758,253.17 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION/EXTENSION OF FLOOD CONTROL STRUCTURE (REVETMENT) ALONG DAPITAN RIVER, TUTUA-POLO SECTION ALONG DIPOLOG-OROQUIETA ROAD, DAPITAN CITY, ZAMBOANGA DEL NORTE19J00042 · ₱106,830,233.00 · mapped
- WIDENING OF PERMANENT BRIDGES - DICAYO BRIDGE (B00425MN) ALONG DIPOLOG - SINDANGAN - LILOY ROAD18J00032 · ₱106,311,353.00 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG LILOY-SIOCON ROAD, K2035+132 -K2035 +36223JJ0043 · ₱106,150,000.00 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - EXTENSION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER (DOWNSTREAM), SIOCON, ZAMBOANGA DEL NORTE18J00043 · ₱105,327,150.88 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAYAWAN RIVER, LAYAWAN BRIDGE SECTION (BOO422MN) DOWNSTREAM ALONG DIPOLOG-PUNTA-DANSULLAN-SERGIO OSM22J00026 · ₱104,825,964.89 · mapped
- WIDENING OF PERMANENT BRIDGES - LAYAWAN BR. (BOO422MN) ALONG DIPOLOG - PUNTA - DANSULLAN S OSMENA, ZAMBOANGA DEL NORTE/SUR BOUNDARY ROAD22J00021 · ₱103,428,690.31 · mapped
- ROAD WIDENING - PRIMARY ROADS DIPOLOG - PUNTA - DANSULLAN - SERGIO OSMEÑA - ZAMBOANGA DEL NORTE/SUR BOUNDARY ROAD21J00060 · ₱102,560,726.84 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - DIPOLOG - SINDANGAN - LILOY ROAD22J00001 · ₱101,492,472.09 · mapped
- PAVING OF UNPAVED ROAD RIZAL - DAKAK - DAPITAN COASTAL LOOP ROAD, ZAMBOANGA DEL NORTE 3RD DEO, K1849+601.00 - K1852+010.19, K1854+026.00 - K1854+860.00, NET LENGTH: 6.49 LANE KM/3,243.00 LN.M./3.243 KM18J00050 · ₱101,320,514.00 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DICAYO BRIDGE SECTION, KATIPUNAN, ZAMBOANGA DEL NORTE (PACKAGE 1)23J00014 · ₱100,284,921.68 · mapped
- WIDENING OF PERMANENT BRIDGES - OPAO BR. (B01784MN) ALONG DIPOLOG- OROQUIETA NATIONAL ROAD22J00022 · ₱98,741,758.68 · mapped
- CONSTRUCTION OF NEW PERMANENT BRIDGES POLO BRIDGE ALONG JCT. POLO - DAPITAN PARK NATIONAL ROAD, DAPITAN CITY, ZAMBOANGA DEL NORTE19J00037 · ₱98,285,250.00 · mapped
- CONSTRUCTION OF BYPASS AND DIVERSION ROADS NRJ BIASONG-MINAOG BYPASS ROAD, ZAMBOANGA DEL NORTE22J00004 · ₱98,049,053.70 · mapped
- ROAD WIDENING - PRIMARY ROADS - DIPOLOG - SINDANGAN - LILOY ROAD22J00002 · ₱97,789,773.68 · mapped
- REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS- PRIMARY ROADS - DIPOLOG - SINDANGAN - LILOY ROAD23J00008 · ₱97,378,355.96 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - DIPOLOG - SINDANGAN - LILOY ROAD23J00009 · ₱97,362,853.67 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LEFT BANK OF DISACAN RIVER (UPSTREAM AND DOWNSTREAM) PACKAGE 219J00029 · ₱96,690,574.00 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
