CONSTRUCTION / REHABILITATION OF FLOOD CONTROL MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT DAPITAN RIVER, OPAO BRIDGE SECTION (B01784MN) (DOWNSTREAM) ALONG DIPOLOG-OROQUIETA ROAD (S0131
CONSTRUCTION / REHABILITATION OF FLOOD CONTROL MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT DAPITAN RIVER, OPAO BRIDGE SECTION (B01784MN) (DOWNSTREAM) ALONG DIPOLOG-OROQUIETA ROAD (S0131 is a DPWH-tracked public work in Region IX, Region IX. Reported contract value: ₱134,656,950.52. Status: Past target date (DPWH On-Going). Contractor on record: MONTAÑO CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
