REHAB./RECONST. OF MISAMIS ORIENTAL-BUKIDNON-AGUSAN ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, K1445+648-K1445+680, MALITBOG, BUKIDNON
REHAB./RECONST. OF MISAMIS ORIENTAL-BUKIDNON-AGUSAN ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, K1445+648-K1445+680, MALITBOG, BUKIDNON is a DPWH-tracked public work in Bukidnon 3rd DEO, Region X. Reported contract value: ₱30,380,000.00. Status: Reported complete (DPWH). Contractor on record: EQUI-PARCO CONST CO. Figures trace to dpwh.
Total Contract Cost

