RETROFITTING /STRENGTHENING OF BRIDGE - ALONG MAINGARAN BR. (B00008MT) ALONG MASBATE-MILAGROS RD, NET LENGTH = 1.00 PROJECT (21.80 METERS), MASBATE CITY
RETROFITTING /STRENGTHENING OF BRIDGE - ALONG MAINGARAN BR. (B00008MT) ALONG MASBATE-MILAGROS RD, NET LENGTH = 1.00 PROJECT (21.80 METERS), MASBATE CITY is a DPWH-tracked public work in Masbate 2nd DEO, Region V. Reported contract value: ₱5,585,948.37. Status: Reported complete (DPWH). Contractor on record: EC STRUCTURAL COMPOSITES INC. Figures trace to dpwh.
Total Contract Cost
