Flood Control and Drainage25DQ0041

CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY TIAGO, GENERAL MARIANO ALVAREZ, CAVITE; CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY GRANADOS, GENERAL MARIANO ALVAREZ, CAVITE AND CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY POBLACION 1 AND POB

CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY TIAGO, GENERAL MARIANO ALVAREZ, CAVITE; CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY GRANADOS, GENERAL MARIANO ALVAREZ, CAVITE AND CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY POBLACION 1 AND POB is a DPWH-tracked public work in Cavite 3rd DEO, Region IV-A. Reported contract value: ₱19,214,526.89. Status: Past target date (DPWH On-Going). Contractor on record: CMMJ CONST. Figures trace to dpwh.

Cavite 3rd DEO, Region IV-A
Region: Region IV-A

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Probable match · score 90%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Barangay Tiago, General Mariano Alvarez, Cavite
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Cavite 3rd DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

16 projects · ₱231.5M total · 0 flags

4. Implementation

Contract Amount

₱19,214,526.89

Progress

Past target date (DPWH On-Going)

Start Date

February 17, 2025

Target End

July 21, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.