Construction of River Bank Protection along Ala River, Brgy. Dajay, Surallah, South Cotabato
Construction of River Bank Protection along Ala River, Brgy. Dajay, Surallah, South Cotabato is a DPWH-tracked public work in SURALLAH (SOUTH COTABATO), SOUTH COTABATO, Region XII. Reported contract value: ₱83,327,324.86. Status: Reported complete (DPWH). Contractor on record: ABU CONST. Figures trace to sumbong.
Total Contract Cost


