Construction of Natubgan Flood Control (Upstream Left Side), Kananga, Leyte
Construction of Natubgan Flood Control (Upstream Left Side), Kananga, Leyte is a DPWH-tracked public work in KANANGA (LEYTE), LEYTE, Region VIII. Reported contract value: ₱48,999,997.17. Status: Reported complete (DPWH). Contractor on record: LEDA CONST INC. Figures trace to sumbong.
Total Contract Cost
