REHABILITATION/ RESTORATION OF DETERIOTED DIKES/ ERODED PAMPANGA RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL: SLOPE PROTECTION STA. 0+450.08--STA. 0+406 LEFT & RIGHT DIKE AND SAN SIMON (BRGY. SAN PEDRO), STA. 0+070-STA.0+151.20 RIGHT
REHABILITATION/RESTORATION OF DETERIOTED DIKES/ERODED PAMPANGA RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL: SLOPE PROTECTION STA. 0+450.08--STA. 0+406 LEFT & RIGHT DIKE AND SAN SIMON (BRGY. SAN PEDRO), STA. 0+070-STA.0+151.20 RIGHT is a DPWH-tracked public work in Flood Control Management Cluster, Central Office. Reported contract value: ₱92,034,400.00. Status: Reported complete (DPWH). Contractor on record: ST GERRARD CONST GEN CONTRACTOR. Figures trace to dpwh.
Total Contract Cost