Construction of Flood Mitigation Structures along Bacoor River, Phase 4, Bacoor City, Cavite
Construction of Flood Mitigation Structures along Bacoor River, Phase 4, Bacoor City, Cavite is a DPWH-tracked public work in BACOOR CITY (CAVITE), CAVITE, Region IV-A. Reported contract value: ₱48,995,805.15. Status: Reported complete (DPWH). Contractor on record: E R RODRIGUEZ CONST CORP FORMERLY: E R RODRIGUEZ CONST. Figures trace to sumbong.
Total Contract Cost



