GAA 2020 OO-220OC0032

CONSTRUCTION OF REVETMENT WALL/SHEETPILING OF SAN DIONISIO RIVER, BRGY. SAN DIONISIO,PARAÑAQUE CITY, METRO MANILA

CONSTRUCTION OF REVETMENT WALL/SHEETPILING OF SAN DIONISIO RIVER, BRGY. SAN DIONISIO,PARAÑAQUE CITY, METRO MANILA is a DPWH-tracked public work in Metro Manila 2nd DEO, National Capital Region. Reported contract value: ₱95,330,000.00. Status: Reported complete (DPWH). Contractor on record: E R RODRIGUEZ CONST CORP FORMERLY: E R RODRIGUEZ CONST 12596. Figures trace to dpwh.

Metro Manila 2nd DEO, National Capital Region
Region: National Capital Region

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

No GAA appropriation line matched for this project at current confidence thresholds.

2. Allotment

No SARO/NCA release rows linked to this project yet. See DBM release listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 12596

31 projects · ₱1.3B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONST. OF SLOPE PROTECTION STRUCTURE ALONG RIVERSIDE, BASECO COMPOUND, PORT AREA, MANILA

South Manila DEO, National Capital Region

2024₱96.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG VARIOUS CREEKS AND TRIBUTARIES, PARAÑAQUE RIVER (DISTRICT I),PARAÑAQUE CITY, METRO MANILA

Metro Manila 2nd DEO, National Capital Region

2024₱96.0M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MARULAS CREEK,PARAÑAQUE CITY, METRO MANILA

Metro Manila 2nd DEO, National Capital Region

2024₱95.1M
Past target date (DPWH On-Going)

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE & DRAINAGE OF MALABON TULLAHAN RIVER, BRGY. GULOD, Q.C.

Quezon City 1st DEO, National Capital Region

2017₱84.9M
Past target date (DPWH On-Going)
No sat.

CLUSTER I-CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-I-I-CONSTRUCTION OF BARAS-GIGMOTO-VI

Region V, Region V

2022₱55.0M
Past target date (DPWH On-Going)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BELMONTE-BATONG PALOWAY, SAN ANDRES, CATANDUANES, SAN AN

Region V, Region V

2021₱52.1M
Reported complete (DPWH)
View all 31 projects →

4. Implementation

Contract Amount

₱95,330,000.00

Progress

Reported complete (DPWH)

Start Date

July 23, 2020

Target End

June 17, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.