Construction of Flood Mitigation Structure Construction of Flood Mitigation Structure along Sagadan Bridge (B00961MN), Downstream (R/S), Tubod, Lanao del Norte
Construction of Flood Mitigation Structure Construction of Flood Mitigation Structure along Sagadan Bridge (B00961MN), Downstream (R/S), Tubod, Lanao del Norte is a DPWH-tracked public work in TUBOD (CAPITAL) (LANAO DEL NORTE), LANAO DEL NORTE, Region X. Reported contract value: ₱115,800,000.00. Status: Reported complete (DPWH). Contractor on record: PLD CONST AND DEVELOPMENT INC FORMERLY: PLD CONST / LANAO BUILDER AND ENT. Figures trace to sumbong.
Total Contract Cost
