Flood Control and Drainage20CD0003

CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAN MIGUEL SIBUL ROAD AT TARTARO RIVER, SAN MIGUEL, BULACAN

CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAN MIGUEL SIBUL ROAD AT TARTARO RIVER, SAN MIGUEL, BULACAN is a DPWH-tracked public work in Bulacan 2nd DEO, Region III. Reported contract value: ₱16,854,316.77. Status: Reported complete (DPWH). Contractor on record: MRRM TRADING. Figures trace to dpwh.

Bulacan 2nd DEO, Region III
Region: Region III

Money Trail

1. Appropriation

Probable match · score 90%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Const.of Flood Control Structures along San Miguel-Sibul Road at Sibul River San Miguel, Bulacan
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Bulacan 2nd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

79 projects · ₱2.9B total · 0 flags

Other projects by this contractor

SUSTAINABLE INFRASTRURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER (UPSTREAM), BARANGAY MALIGAYA, SAN MIGUEL, BULACAN

Region III, Region III

2024₱96.5M
Reported complete (DPWH)

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURES ALONG ZAPOTE RIVER, BRGY.

Region IV-A, Region IV-A

2018₱92.6M
Reported complete (DPWH)
No sat.

REHABILITATION OF ROAD WITH SLIP, SLOPE COLLAPSE AND LANDSLIDE ALONG ACCESS ROAD MALBOG JCT. - STA. FE GUINBIRAYAN PROVINCIAL ROAD LEADING TO SAN JOSE BEACHES, STA. 07+486.20 - STA. 07+634.80, STA. FE, ROMBLON

Romblon DEO, Region IV-B

2022₱86.8M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG ODIONGAN-EAST-WEST RD, K0008+940 - K0008+986, TABLAS ISLAND, ROMBLON

Romblon DEO, Region IV-B

2022₱86.8M
Reported complete (DPWH)
No sat.

CONST. OF TWO (2) UNITS FOUR (4) STOREY, SIXTEEN (16) CLASSROOM S/B AT PEDRO E. DIAZ, H/S, MUNTINLUP

Las Piñas-Muntinlupa DEO, National Capital Region

2018₱78.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF SUGOD-CAWAYAN ROAD LEADING TO BLUE HOLES, STA. 11+100.00 - STA. 11+200.00, STA. 11+510.00 - STA. 11+548.30, SAN AGUSTIN, ROMBLON

Romblon DEO, Region IV-B

2022₱77.2M
Reported complete (DPWH)
View all 79 projects →

4. Implementation

Contract Amount

₱16,854,316.77

Progress

Reported complete (DPWH)

Start Date

March 3, 2020

Target End

July 20, 2020

5. Audit