ASSET PRESERVATION OF NATIONAL ROADS-REHAB./RECONST./UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MGMT SYSTEM/HDM, SECTION 1: ABRA-KALINGA RD, KO454+000-KO456+000; SECTION 2: ABRA-KALINGA RD, KO409+507-KO409+507-KO412+000
ASSET PRESERVATION OF NATIONAL ROADS-REHAB./RECONST./UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MGMT SYSTEM/HDM, SECTION 1: ABRA-KALINGA RD, KO454+000-KO456+000; SECTION 2: ABRA-KALINGA RD, KO409+507-KO409+507-KO412+000 is a DPWH-tracked public work in Abra DEO, Cordillera Administrative Region. Reported contract value: ₱31,504,360.25. Status: Reported complete (DPWH). Contractor on record: R A FANGLAYAN RAF GEN CONST INC FORMERLY:RAF GEN CONST. Figures trace to dpwh.
Total Contract Cost
