002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONST/ MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONST/REHAB OF FLOOD CONTROL STRUCTURE ALONG WARAS RIVER UPSTREAM OF STA. ELENA NABUA-SAGRADA BAAO SPILLWAY, IRIGA CITY SECTION
002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONST/ MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONST/REHAB OF FLOOD CONTROL STRUCTURE ALONG WARAS RIVER UPSTREAM OF STA. ELENA NABUA-SAGRADA BAAO SPILLWAY, IRIGA CITY SECTION is a DPWH-tracked public work in Camarines Sur 5th DEO, Region V. Reported contract value: ₱62,394,193.50. Status: Reported complete (DPWH). Contractor on record: MAKAPA CORP. Figures trace to dpwh.
Total Contract Cost




