Bridges15KG0061

REHAB./MAJOR REPAIR OF PERMANENT BRIDGE, NINGAL BRIDGE (FVR) (B01720MN) ALONG LANAO DEL NORTE INTERIOR CIRCUMFERENTIAL ROAD (LDNICR), SAPAD, LANAO DEL NORTE

REHAB./MAJOR REPAIR OF PERMANENT BRIDGE, NINGAL BRIDGE (FVR) (B01720MN) ALONG LANAO DEL NORTE INTERIOR CIRCUMFERENTIAL ROAD (LDNICR), SAPAD, LANAO DEL NORTE is a DPWH-tracked public work in Lanao del Norte 2nd DEO, Region X. Reported contract value: ₱3,621,122.63. Status: Reported complete (DPWH). Contractor on record: AL-AMEN BUILDERS. Figures trace to dpwh.

Lanao del Norte 2nd DEO, Region X
Region: Region X

Money Trail

1. Appropriation

Possible match · score 77%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction / Extension of Flood Control Structure along Dipolog River, Guinles Section (Upstream), Polanco, Zamboanga del Norte
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXII-16-0035528

₱1,475,000.00 · FY2016

Released to Koronadal National Comprehensive High School To re (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

74 projects · ₱1.8B total · 0 flags

Other projects by this contractor

No sat.

INSTALLATION OF SOLAR LED STREETLIGHTS WITHIN BARANGAYS 649 TO 828, PRES. QUIRINO AVE (FROM TAFT AVE. TO SOUTH SUPERHIGHWAY), SOUTH SUPERHIGHWAY (FROM ZOBEL ROXAS ST. TO P. QUIRINO AVE), P. FAURA ST. (SAN MARCELINO ST. TO ROXAS BLVD.), ESCODA ST. (FROM TA

South Manila DEO, National Capital Region

2025₱145.2M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGM'T PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION STRUCTURE OF ESTERO DE PACO, MANILA CITY PHASE 2

South Manila DEO, National Capital Region

2025₱143.2M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGM'T PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION STRUCTURE OF ESTERO DE PACO, MANILA CITY PHASE 1

South Manila DEO, National Capital Region

2025₱143.1M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF SLOPE PROTECTION STRUCTURE ALONG PAGASA SABLAYAN TO VICTORIA ROAD, PALSIKAYON SECTION (PHASE 1), OCC. MINDORO

Region IV-B, Region IV-B

2023₱96.5M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF SLOPE PROTECTION STRUCTURE ALONG PAGASA SABLAYAN TO VICTORIA ROAD, PALSIKAYON SECTION (PHASE 2), OCC. MINDORO

Region IV-B, Region IV-B

2023₱96.5M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF SLOPE PROTECTION STRUCTURE ALONG PAGASA SABLAYAN TO VICTORIA ROAD, PALSIKAYON SECTION (PHASE 3), OCC. MINDORO

Region IV-B, Region IV-B

2023₱96.5M
Reported complete (DPWH)
View all 74 projects →

4. Implementation

Contract Amount

₱3,621,122.63

Progress

Reported complete (DPWH)

Start Date

January 27, 2016

Target End

June 3, 2016

5. Audit