Construction of Flood Control Structure of Talave River (Downstream) Left Bank along Bacolod North Road, San Carlos City, Negros Occidental
Construction of Flood Control Structure of Talave River (Downstream) Left Bank along Bacolod North Road, San Carlos City, Negros Occidental is a DPWH-tracked public work in SAN CARLOS CITY (NEGROS OCCIDENTAL), NEGROS OCCIDENTAL, Region VI. Reported contract value: ₱33,775,000.00. Status: Reported complete (DPWH). Contractor on record: JAIME B CHING ENT. Figures trace to sumbong.
Total Contract Cost
