CONST. OF BARA-AS FLOOD CONTROL MITIGATION AT BARA-AS RIVER,PICONG, LANAO DEL SUL
CONST. OF BARA-AS FLOOD CONTROL MITIGATION AT BARA-AS RIVER,PICONG, LANAO DEL SUL is a DPWH-tracked public work in Region X, Region X. Reported contract value: ₱46,798,585.21. Status: Reported complete (DPWH). Contractor on record: M M A ACHIEVER CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
