M M A ACHIEVER CONST is listed as a company organization in Philippine public procurement records on this site, with 57 linked DPWH project(s) totaling about ₱3,295,016,193.17. Recorded delivery grade C (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
M M A ACHIEVER CONST
CRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 57
- Total value
- ₱3,295,016,193.17
- Published flags
- 0
- Region
- Region X · Region X
Public Record Grade
A transparent, data-derived summary of reported public records for M M A ACHIEVER CONST — not an accusation or finding of wrongdoing.
Score: 79.80 / 100 · Projects in sample: 57 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 65.8/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 65.8
- lateCompletedProjects
- 3
- onTimeCompletedProjects
- 36
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 48
- pastTargetOngoingProjects
- 9
- undatedCompletedProjectsExcluded
- 9
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 57
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 57
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 57
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 57
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
48 geotagged project(s) — Open full map
- CONSTRUCTION OF 2-LANE PCCP PANTAR (LANAO DEL NORTE)-MARAWI CITY (LANAO DEL SUR) ROAD20K00353 · ₱197,420,286.07 · mapped
- ROAD WIDENING BUKIDNON BDRY-NORTH COTABATO RD - (S01606MN) CHAINAGE 6689 - CHAINAGE 8081, CHAINAGE 11121 - CHAINAGE 1512125K00216 · ₱136,604,933.18 · mapped
- WIDENING OF PERMANENT BRIDGES, BALATIN BR. (B02083MN) ALONG BUKIDNON BDRY-NORTH COTABATO RD24K00447 · ₱124,185,383.38 · mapped
- WIDENING OF PERMANENT BRIDGES MATLING PARALLEL BR. ALONG MAHARLIKA HIGHWAY( COTABATO-MALABANG-LANAO DEL NORTE RD)25K00118 · ₱114,638,259.62 · mapped
- CONSTRUCTION OF GANASSI - TUBOD ROAD, MADAMBA SECTION, LANAO DEL SUR23K00144 · ₱114,633,150.53 · mapped
- CLUSTER K REPAIR/ REHAB./ IMPRVT. OF VARIOUS ROADS IN LANAO DEL SUR 1ST18K00305 · ₱102,967,984.45 · mapped
- CONSTRUCTION OF BUBONG-RAMAIN FLOOD CONTROL AND SLOPE PROTECTION, BARANGAY PINDOGOAN, BUBONG, LANAO DEL SUR25K00053 · ₱95,535,003.67 · mapped
- CONSTRUCTION OF GANASSI-TUBOD ROAD, MADAMBA SECTION, LANAO DEL SUR24K00251 · ₱94,576,711.06 · mapped
- REHABILITATION OF MARAWI-MASIU CIRCUMFERENTIAL ROAD, MULONDO SECTION, K1580+101.476 - 1580+580, K1580+752 - K1584+665.88419K00382 · ₱93,766,848.35 · mapped
- CONSTRUCTION OF MALA-LAWASAIG RIVER FLOOD CONTROL AND SLOPE PROTECTION, BARANGAY BUBONG RAMAIN, BUBONG LANAO DEL SUR25K00099 · ₱92,666,938.10 · mapped
- CONSTRUCTION OF FLOOD CONTROL MITIGATION ALONG BUBONG RIVER, BUBONG, LANAO DEL SUR20K00311 · ₱88,926,651.68 · mapped
- REPLACEMENT OF PERMANENT WEAK BRIDGES, MALADI BR. (B02098MN) ALONG COTABATO-MALABANG-LANAO DEL NORTE RD24K00396 · ₱85,967,144.18 · mapped
- REHABILITATION OF BUMBARAN - TALAKAG NATIONAL ROAD, BRGY. MANSILANO - BRGY. UPPER FORT SECTION, BUMBARAN, LANAO DEL SUR20K00312 · ₱84,248,635.85 · mapped
- CONSTRUCTION OF ROAD, BARANGAY GATA, WAO, LANAO DEL SUR25K00190 · ₱78,400,445.53 · mapped
- REHABILITATION/IMPROVEMENT OF MAUL LUMBACA INGUD-RANARANAO ROAD IN MAUL, MARANTAO, LANAO DEL SUR19K00466 · ₱75,117,604.92 · mapped
- UPGRADING/REHABILITATION OF GUIMBA-KAPAI NATIONAL HIGHWAY, KAPAI19K00246 · ₱74,876,291.53 · mapped
- CONST. OF FLOOD CONTROL MITIGATION, PRINCIPAL RIVER BASIN, MATLING RIVER, MALABANG, LANAO DEL SUR21K00117 · ₱70,200,778.49 · mapped
- REHABILITATION OF MARAWI-MALABANG ROAD INCLUDING DRAINAGE, GANASSI -PUALAS SECTION, LANAO DEL SUR20K00314 · ₱70,197,198.02 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, MATLING BR. (B02097MN) ALONG COTABATO-MALABANG-LANAO DEL NORTE RD24K00397 · ₱66,578,359.74 · mapped
- CLUSTER 01 CONSTRUCTION OF VARIOUS BRIDGE PROJECTS IN LANAO DEL SUR1. WIDENING OF PERMANENT BRIDGES KILIKILI BR. 1 ALONG WAO - BUMBARAN ROAD2. WIDENING OF PERMANENT BRIDGES KILIKILI BR. 2 ALONG BUKIDNON BDRY NORTH COTABATO ROAD23K00294 · ₱62,041,163.91 · mapped
- CONSTRUCTION OF LANAO DEL SUR PROVINCIAL HOSPITAL, LANAO DEL SUR (PHASE 1)25K00381 · ₱59,339,192.53 · mapped
- CONSTRUCTION OF BALATIN RIVER FLOOD CONTROL (BALATIN BRIDGE), WAO, LANAO DEL SUR24K00118 · ₱58,107,288.17 · mapped
- CONST. OF FLOOD MITIGATION STRUCTURE AT BARA-AS RIVER, PICONG, LANAO DEL SUR24K00004 · ₱57,905,789.81 · mapped
- ROAD WIDENING-SECONDARY ROADS-BUKIDNON BDRY-NORTH COTABATO RD - K1604 + (-1104) - K1604 + 145, K1608 + 503 - K1609 + 50324K00451 · ₱57,441,973.16 · mapped
- ROAD WIDENING-PRIMARY ROADS, ILIGAN CITY-MARAWI CITY RD-K1554+322.668-K1555+38021K00112 · ₱50,721,078.19 · mapped
- ROAD WIDENING-TERTIARY ROADS MULONDO-WAO ROAD-(S01604MN) CHAINAGE 40-CHAINAGE 204024K00088 · ₱47,766,832.23 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, MADALUM, LANAO DEL SUR24K00163 · ₱47,766,245.67 · mapped
- CONCRETING OF GANASSI-TUBOD ROAD IN MADAMBA SECTION, LANAO DEL SUR24K00157 · ₱47,765,597.45 · mapped
- CONST. OF MALA-LAWASAIG RIVER FLOOD CONTROL AND SLOPE PROTECTION, BARANGAY SUGOD,BAYABAO SECTION, DITSAAN RAMAIN, LANAO DEL SUR24K00518 · ₱47,765,556.43 · mapped
- ROAD WIDENING-SECONDARY ROADS, WAO-BUMBARAN SECTION - (S01605MN) CHAINAGE 4000 - CHAINAGE 600023K00135 · ₱47,763,986.67 · mapped
- REHABILITATION OF GANASSI-TUBOD ROAD, BRGY. UYAAN SECTION, MADAMBA, LANAO DEL SUR20K00318 · ₱47,286,772.47 · mapped
- ROAD WIDENING-TERTIARY ROADS, BUKIDNON BDRY-NORTH COTABATO RD - (S01606MN) CHAINAGE 2295- CHAINAGE 4069.89722K00056 · ₱47,283,590.06 · mapped
- REHABILITATION OF MARAWI-MALABANG ROAD, INCLUDING DRAINAGE, BACOLOD KALAWI SECTION, LANAO DEL SUR20K00319 · ₱47,283,434.71 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS, MARAWI-MALABANG ROAD - (S01652MN) CHAINAGE 6108 - CHAINAGE 775022K00036 · ₱46,800,089.27 · mapped
- ROAD WIDENING-PRIMARY ROADS, BUKIDNON BDRY-NORTH COTABATO RD-K1607+000-K1608+502.621K00110 · ₱46,799,359.89 · mapped
- CONST. OF BARA-AS FLOOD CONTROL MITIGATION AT BARA-AS RIVER,PICONG, LANAO DEL SUL21K00118 · ₱46,798,585.21 · mapped
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS,REHABILITATION OF MULONDO-WAO ROAD, MULONDO-MAGUING SECTION, LANAO DEL SUR22K00208 · ₱46,793,728.47 · mapped
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, MARAWI-MASIU RD - (S01603MN) CHAINAGE 26000 - CHAINAGE 27542.253, CHAINAGE 27637.065 - CHAINAGE 2802323K00143 · ₱46,330,214.43 · mapped
- ROAD WIDENING-SECONDARY ROADS, WAO-BUMBARAN SECTION - (S01605MN) CHAINAGE 6000 - CHAINAGE 800023K00134 · ₱45,705,472.63 · mapped
- REHAD./RECONST./UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS, MOLUNDO-WAO ROAD, K1603+591-K1605+52021K00180 · ₱42,045,406.39 · mapped
- REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-PRIMARY ROADS, BITO-MARAWI RD - (S01700MN) CHAINAGE 1700 - CHAINAGE 187423K00325 · ₱38,213,994.04 · mapped
- CONST./UPGRADING/REHAB. OF DRAIANGE ALONG NATIONAL ROADS-SECONDARY ROADS, MARAWI-MASIU RD - (S01603MN) CHAINAGE 8940 - CHAINAGE 9614.512,CHAINAGE 9730-CHAINAGE 1030522K00308 · ₱37,438,486.51 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS, WAO-BUMBARAN SECTION - (S01605MN) CHAINAGE 2700 - CHAINAGE 400022K00165 · ₱34,341,384.52 · mapped
- CONSTRUCTION OF GATA RIVER FLOOD CONTROL WITH SLOPE PROTECTION, BRGY. CAIRAN, ROGAN, POONA BAYABAO, LANAO DEL SUR24K00378 · ₱32,479,506.40 · mapped
- REHAB./RECONST.OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-TERTIARY ROADS- MULONDO-WAO RD - (S01604MN) CHAINAGE 8600 - CHAINAGE 880024K00423 · ₱28,660,497.81 · mapped
- WIDENING OF WAO NATIONAL ROAD, KILIKILI SECTION, WAO, LANAO DEL SUR20K00325 · ₱28,372,474.89 · mapped
- CONC. OF BRGY. BANGA NATL HIGHWAY MT. SPRING RESORT, WAO, LDS 1ST LD15K00445 · ₱28,080,935.76
- CONCRETING OF EXTENSIO-MUSLIM VILLAGE, LDS 1ST LD15K00446 · ₱28,051,449.20 · mapped
- CLUSTER B CONSTRUCTION/COMPLETION OF VARIOUS MULTI-PURPOSE BUILDING IN LANAO DEL SUR 1ST LD19K00401 · ₱24,873,869.02 · mapped
- CONC. OF BUOT-MALAYA PROVL. ROAD,WAO,LDS 1ST LD15K00449 · ₱23,584,210.84
